Change Request Application
Statement of Purpose
DownloadView1 Supplementary Land Plans showing Proposed Land Changes
DownloadView1.5 Application document tracker – Revision 7
DownloadView2.1 Location Plan (Revision 3)
DownloadView2.2 Works Plans (Revision 3)
DownloadView2.3 Street Works, Rights of Way and Access Plans (Revision 5)
DownloadView2.x Land Plans showing Proposed Land Changes
DownloadView2.5 Environmental Masterplan (Revision 3)
DownloadView3.3 Schedule of Changes to dDCO – Change Application (Revision 2)
DownloadView4.1 Statement of Reasons (Revision 2)
DownloadView4.2 Book of Reference (Revision 4)
DownloadView4.4 Book of Reference Schedule of Changes (Revision 3)
DownloadView8.5 Compulsory Acquisition Negotiation Schedule (Revision 3)
DownloadView8.14 Change Application Summary Report
DownloadViewByers Gill dDCO – Track Changes Revision 3 vs Revision 2 – Change Application(54410064.1)
DownloadViewByers Gill dDCO – Revision 3 – Change Application – CLEAN SI(54409753.1)
DownloadViewByers Gill ExMem – Change Application – CLEAN(54412838.1)
DownloadViewByers Gill ExMem – Track Changes Change Application vs. Revision 2 – Change Application(54412904.1)
DownloadViewES Appendix 2.15 – Outline PRoW Management Plan (Revision 2)
DownloadViewES Figure 12.1 Proposed Access Routes and Survey Locations (Revision 2)
DownloadView
Post Application Documents
1.5 Application document tracker – Revision 2
DownloadView2.3 Street Works, Rights of Way and Access Plans – Revision 2
DownloadView7.2 Design Approach Document – Revision 2
DownloadViewES Appendix 10.1 Flood Risk Assessment and Drainage Strategy_March 2023 S51 Advice Revision (Clean) – Revision 2
DownloadViewES Appendix 10.1 Flood Risk Assessment and Drainage Strategy_March 2023 S51 Advice Revision (Tracked) – Revision 2
DownloadViewRWE Byers Gill Solar Response to S51 Advice_cover letter
DownloadView
Application Index
Application-Index
Download
Volume 1 – Application Information
1.1 Application Cover Letter
DownloadView1.2 Introduction to the Application
DownloadView1.3 Byers Gill Solar DCO Application Form Electronic Unsigned Copy
DownloadView1.3 Byers Gill Solar DCO Application Form Scanned Signed Copy
DownloadView1.4 Section 55 Checklist
DownloadView1.5 Application Document Tracker
DownloadView
Volume 2 – Plans, Drawings, and Designations
Volume 3 – Development Consent Order
Volume 4 – Compulsory Acquisition Information
Volume 5 – Consultation Report
Volume 6 – Environmental Statement
6.1.1 Environmental Statement Non-Technical Summary
DownloadView6.2.0 Environmental Statement Chapter 0 Contents, Glossary and Abbreviations
DownloadView6.2.1 Environmental Statement Chapter 1 Introduction
DownloadView6.2.2 Environmental Statement Chapter 2 The Proposed Development
DownloadView6.2.3 Environmental Statement Chapter 3 Alternatives and Design Iteration
DownloadView6.2.4 Environmental Statement Chapter 4 Approach to EIA
DownloadView6.2.5 Environmental Statement Chapter 5 Climate Change
DownloadView6.2.6 Environmental Statement Chapter 6 Biodiversity
DownloadView6.2.7 Environmental Statement Chapter 7 Landscape and Visual
DownloadView6.2.8 Environmental Statement Chapter 8 Cultural Heritage and Archaeology
DownloadView6.2.9 Environmental Statement Chapter 9 Land Use and Socioeconomics
DownloadView6.2.10 Environmental Statement Chapter 10 Hydrology and Flood Risk
DownloadView6.2.11 Environmental Statement Chapter 11 Noise and Vibration
DownloadView6.2.12 Environmental Statement Chapter 12 Traffic and Transport
DownloadView6.2.13 Environmental Statement Chapter 13 Cumulative Effects
DownloadView6.2.14 Environmental Statement Chapter 14 Summary
DownloadView6.3.1.1 Environmental Statement Figure 1.1 Location Plan
DownloadView6.3.2.1 Environmental Statement Figure 2.1 Panel Areas
DownloadView6.3.2.2 Environmental Statement Figure 2.2 General Arrangement Scheme Wide
DownloadView6.3.2.3 Environmental Statement Figure 2.3 General Arrangement Panel Area A
DownloadView6.3.2.4 Environmental Statement Figure 2.4 General Arrangement Panel Area B
DownloadView6.3.2.5 Environmental Statement Figure 2.5 General Arrangement Panel Area C
DownloadView6.3.2.6 Environmental Statement Figure 2.6 General Arrangement Panel Area D
DownloadView6.3.2.7 Environmental Statement Figure 2.7 General Arrangement Panel Area E
DownloadView6.3.2.8 Environmental Statement Figure 2.8 General Arrangement Panel Area F
DownloadView6.3.2.9 Environmental Statement Figure 2.9 Cross-section of a typical fixed solar panel (normal and ballasted)
DownloadView6.3.2.10 Environmental Statement Figure 2.10 Typical Inverter, Transformer and BESS arrangement
DownloadView6.3.2.11 Environmental Statement Figure 2.11 Typical Access and Supporting Infrastructure Layout
DownloadView6.3.2.12 Environmental Statement Figure 2.12 Typical Switchgear
DownloadView6.3.2.13 Environmental Statement Figure 2.13 Underground Cable Routes
DownloadView6.3.2.14 Environmental Statement Figure 2.14 Typical Substation
DownloadView6.3.2.15 Environmental Statement Figure 2.15 Typical Fence and Gate
DownloadView6.3.2.16 Environmental Statement Figure 2.16 Typical CCTV pole
DownloadView6.3.2.17 Environmental Statement Figure 2.17 Cross-section of a typical access track
DownloadView6.3.2.18 Environmental Statement Figure 2.18 Typical storage container
DownloadView6.3.2.19 Environmental Statement Figure 2.19 Environmental Constraints Plan
DownloadView6.3.2.20 Environmental Statement Figure 2.20 Landscape Concept Masterplan
DownloadView6.3.2.21 Environmental Statement Figure 2.21 Construction Compounds and Access Routes
DownloadView6.3.3.1 Environmental Statement Figure 3.1 Sequential Analysis Assessment Plan
DownloadView6.3.6.1 Environmental Statement Figure 6.1 Designated Sites
DownloadView6.3.6.2 Environmental Statement Figure 6.2 UK Habitats Survey
DownloadView6.3.7.1 Environmental Statement Figure 7.1 Landscape Context
DownloadView6.3.7.2 Environmental Statement Figure 7.2 Zone of Theoretical Visibility Study – Panel Areas
DownloadView6.3.7.3 Environmental Statement Figure 7.3 Zone of Theoretical Visibility Study – Intensity
DownloadView6.3.7.4 Environmental Statement Figure 7.4 Topography and Landcover
DownloadView6.3.7.5 Environmental Statement Figure 7.5 Landscape Receptors
DownloadView6.3.7.6 Environmental Statement Figure 7.6 Key Settlements
DownloadView6.3.7.7 Environmental Statement Figure 7.7 Visual Receptors
DownloadView6.3.7.8 Environmental Statement Figure 7.8 Zone of Theoretical Visibility – Substation
DownloadView6.3.7.9 Environmental Statement Figure 7.9 Visualisations 1-11
DownloadView6.3.7.9 Environmental Statement Figure 7.9 Visualisations 12-18
DownloadView6.3.7.9 Environmental Statement Figure 7.9 Visualisations 19-25
DownloadView6.3.7.9 Environmental Statement Figure 7.9 Visualisations 26-34
DownloadView6.3.8.1 Environmental Statement Figure 8.1 Order Limits, location and non-designated heritage assets
DownloadView6.3.8.2 Environmental Statement Figure 8.2 Site Area and Assets Scoped in for Detailed Assessment
DownloadView6.3.8.3 Environmental Statement Figure 8.3 Panel Area and Geophysics Areas Concordance
DownloadView6.3.8.4Environmental Statement Figure 8.4 Areas of Known and Potential Archaeology
DownloadView6.3.9.1 Environmental Statement Figure 9.1 Study Area
DownloadView6.3.9.2 Environmental Statement Figure 9.2 Other Land Uses
DownloadView6.3.9.3 Environmental Statement Figure 9.3 Public Rights of Way
DownloadView6.3.9.4 Environmental Statement Figure 9.4 Community and Recreational Facilities
DownloadView6.3.9.5 Environmental Statement Figure 9.5 Agricultural Land Classification
DownloadView6.3.10.1 Environmental Statement Figure 10.1 Hydrological Features
DownloadView6.3.10.2 Environmental Statement Figure 10.2 Topography
DownloadView6.3.10.3 Environmental Statement Figure 10.3 Solid Geology
DownloadView6.3.10.4 Environmental Statement Figure 10.4 Superficial Geology
DownloadView6.3.10.5 Environmental Statement Figure 10.5 WFD Waterbodies and Catchments
DownloadView6.3.10.6 Environmental Statement Figure 10.6 Fluvial Flood Risk
DownloadView6.3.10.7 Environmental Statement Figure 10.7 Pluvial Flood Risk
DownloadView6.3.11.1 Environmental Statement Figure 11.1 Sensitive Receptor Location Plan
DownloadView6.3.11.2 Environmental Statement Figure 11.2 Noise Monitoring Location Plan
DownloadView6.3.11.3 Environmental Statement Figure 11.3 Noise Contours Across Area A
DownloadView6.3.11.4 Environmental Statement Figure 11.4 Noise Contours Across Area B
DownloadView6.3.11.5 Environmental Statement Figure 11.5 Noise Contours Across Area C
DownloadView6.3.11.6 Environmental Statement Figure 11.6 Noise Contours Across Area D
DownloadView6.3.11.7 Environmental Statement Figure 11.7 Noise Contours Across Area E
DownloadView6.3.11.8 Environmental Statement Figure 11.8 Noise Contours Across Area F
DownloadView6.3.12.1 Environmental Statement Figure 12.1 Proposed Access Routes and Survey Locations
DownloadView6.3.12.2 Environmental Statement Figure 12.2 Order Limits and Study Area
DownloadView6.3.12.3 Environmental Statement Figure 12.3 Network Diagram
DownloadView6.3.13.1 Environmental Statement Figure 13.1 Long List of Committed Developments
DownloadView6.3.13.2 Environmental Statement Figure 13.2 Short List of Committed Developments
DownloadView6.4.1.1 Environmental Statement Appendix 1.1 Competent Expert Evidence
DownloadView6.4.2.1 Environmental Statement Appendix 2.1 Phase 1 Geoenvironmental and Geotechnical Desk Study
DownloadView6.4.2.2 Environmental Statement Appendix 2.2 Solar Photovoltaic Glint and Glare Study
DownloadView6.4.2.3 Environmental Statement Appendix 2.3 Assessment of Likely Waste Arisings
DownloadView6.4.2.4 Environmental Statement Appendix 2.4 Construction Dust Assessment
DownloadView6.4.2.5 Environmental Statement Appendix 2.5 Major Accidents and Disasters Assessment
DownloadView6.4.2.6 Environmental Statement Appendix 2.6 Outline Construction Environmental Management Plan
DownloadView6.4.2.7 Environmental Statement Appendix 2.7 Outline Decommissioning Environmental Management Plan
DownloadView6.4.2.8 Environmental Statement Appendix 2.8 Outline Construction Traffic Management Plan (CTMP)
DownloadView6.4.2.9 Environmental Statement Appendix 2.9 Outline Pollution and Spillage Response Plan
DownloadView6.4.2.10 Environmental Statement Appendix 2.10 Outline Materials Management Plan (MMP)
DownloadView6.4.2.11 Environmental Statement Appendix 2.11 Outline Site Waste Management Plan (SWMP)
DownloadView6.4.2.12 Environmental Statement Appendix 2.12 – Outline Soil Resources Management Plan
DownloadView6.4.2.13 Environmental Statement Appendix 2.13 Outline Battery Fire Safety Management Plan (oBFSMP)
DownloadView6.4.2.14 Environmental Statement Appendix 2.14 Outline Landscape and Ecology Management Plan (LEMP)
DownloadView6.4.2.15 Environmental Statement Appendix 2.15 Public Rights of Way (PRoW) Management Plan
DownloadView6.4.4.1 Environmental Statement Appendix 4.1 EIA Scoping Report
DownloadView6.4.4.2 Environmental Statement Appendix 4.2 EIA Scoping Opinion
DownloadView6.4.4.3 Environmental Statement Appendix 4.3 EIA Scoping Opinion Response Matrix
DownloadView6.4.5.1 Environmental Statement Appendix 5.1 Greenhouse Gas Assessment
DownloadView6.4.5.2 Environmental Statement Appendix 5.2 Climate Change Resilience Assessment
DownloadView6.4.6.1 Environmental Statement Appendix 6.1 Preliminary Ecological Appraisal Report
DownloadView6.4.6.2 Environmental Statement Appendix 6.2 Wintering Bird Survey Report
DownloadView6.4.6.3 Environmental Statement Appendix 6.3 Breeding Bird Survey Report
DownloadView6.4.6.4 Environmental Statement Appendix 6.4 Static Detector Bat Survey Report
DownloadView6.4.6.5 Environmental Statement Appendix 6.5 Habitats Regulations Assessment No Significant Effects Report
DownloadView6.4.6.6 Environmental Statement Appendix 6.6 BNG Report
DownloadView6.4.7.1 Environmental Statement Appendix 7.1 Methodology
DownloadView6.4.7.2 Environmental Statement Appendix 7.2 Illustrative Views
DownloadView6.4.7.3 Environmental Statement Appendix 7.3 Landscape Sensitivity Analysis
DownloadView6.4.7.4 Environmental Statement Appendix 7.4 Viewpoint Analysis
DownloadView6.4.7.5 Environmental Statement Appendix 7.5 Non-significant effects
DownloadView6.4.7.6 Environmental Statement Appendix 7.6 Residential Visual Amenity Assessment
DownloadView6.4.7.7 Environmental Statement Appendix 7.7 Arboricultural Impact Assessment
DownloadView6.4.8.1 Environmental Statement Appendix 8.1 Historic Environment Desk-based Assessment (HEDBA) – Figure 96 (Part 1 of 2)
DownloadView6.4.8.1 Environmental Statement Appendix 8.1 Historic Environment Desk-based Assessment (HEDBA) – Figure 96 (Part 2 of 2)
DownloadView6.4.8.1 Environmental Statement Appendix 8.1 Historic Environment Desk-based Assessment (HEDBA) – Figures 1-74
DownloadView6.4.8.1 Environmental Statement Appendix 8.1 Historic Environment Desk-based Assessment (HEDBA) – Figures 75-95 (Part 1 of 2)
DownloadView6.4.8.1 Environmental Statement Appendix 8.1 Historic Environment Desk-based Assessment (HEDBA) – Figures 75-95 (Part 2 of 2)
DownloadView6.4.8.1 Environmental Statement Appendix 8.1 Historic Environment Desk-based Assessment (HEDBA) – Plates 1-73
DownloadView6.4.8.1 Environmental Statement Appendix 8.1 Historic Environment Desk-based Assessment (HEDBA)
DownloadView6.4.8.2 Environmental Statement Appendix 8.2 Historic Environment Settings Assessment
DownloadView6.4.8.3 Environmental Statement Appendix 8.3 Detailed Gradiometer Survey Report
DownloadView6.4.8.4 Environmental Statement Appendix 8.4 Phase 1 Evaluation Trenching Report
DownloadView6.4.8.5 Environmental Statement Appendix 8.5 Archaeological Management Strategy
DownloadView6.4.9.1 Environmental Statement Appendix 9.1 Agricultural Land Classification and Soil Resources
DownloadView6.4.9.2 Environmental Statement Appendix 9.2 Agricultural Land Assessment Criteria
DownloadView6.4.10.1 Environmental Statement Appendix 10.1 Flood Risk Assessment and Drainage Strategy
DownloadView6.4.10.2 Environmental Statement Appendix 10.2 Water Framework Directive Assessment
DownloadView6.4.11.1 Environmental Statement Appendix 11.1 Noise and Vibration Guidance
DownloadView6.4.11.2 Environmental Statement Appendix 11.2 Noise Monitoring Data
DownloadView6.4.11.3 Environmental Statement Appendix 11.3 Details of Noise Model
DownloadView6.4.11.4 Environmental Statement Appendix 11.4 BS4142 Assessment Calculations
DownloadView6.4.11.5 Environmental Statement Appendix 11.5 Selection of background levels
DownloadView6.4.12.1 Environmental Statement Appendix 12.1 Transport Statement
DownloadView6.4.13.1 Environmental Statement Appendix 13.1 In-Combination Effects Table
DownloadView6.4.13.2 Environmental Statement Appendix 13.2 Long List of Committed Developments
DownloadView6.4.13.3 Environmental Statement Appendix 13.3 Short List of Committed Developments
DownloadView
Volume 7 – Other Reports
7.1 Planning Statement
DownloadView7.2 Design Approach Document
DownloadView7.3 Other Consents and Licences
DownloadView7.4 Statement of Statutory Nuisance
DownloadView7.5 Grid Connection Statement
DownloadView7.6 Potential Main Issues for Examination (PMIE)
DownloadView7.7 Statutory Undertakers Position Statement Issue
DownloadView7.7.1 Appendix A Policy Compliance Document
DownloadView7.8 Mitigation Route Map
DownloadView